Circutor Computer 8d96 Manual Full !new! (Editor's Choice)
| Code | Meaning | Solution (from manual) | | :--- | :--- | :--- | | E-01 | Overvoltage (>110% of nominal) | Check supply voltage, adjust transformer tap | | E-02 | Undervoltage (<80% of nominal) | Check supply, capacitor bank internal fuse | | E-03 | Current too low (<5mA) | CT open circuit? Check wiring to terminal 4/5 | | E-04 | Wrong phase sequence | Swap any two voltage leads (L1/L3) | | E-06 | Over-temperature (internal >70°C) | Clean vents, reduce ambient temperature |
The unit features two sets of terminals (upper and lower) for wiring: circutor computer 8d96 manual full
Connect the voltage measurement (usually L2-L3) and the CT input. 3. Setup & Configuration Menu (Parameters) Access the setup menu to configure the following: Default is typically 1.00. C/K Ratio: | Code | Meaning | Solution (from manual)
To enter programming mode: