Skip to main content

🏗️ Areas along the route—specifically Virar East, Kalyan, Dombivli, and Panvel —are poised for significant appreciation. This corridor opens up vast tracts of land for affordable housing near economic hubs.

| Symbol / Color | Meaning | |----------------------|---------------------------------------| | | VAMC main alignment (6/8 lane) | | Blue dashed line | Proposed rail/metro along the median | | Black dots | Toll plazas (5–6 planned) | | Green patches | Eco-sensitive zones (tunnel/viaduct) | | Yellow stars | Major interchanges | | Orange circles | Truck stops / logistics parks |

While the Virar-Alibaug Multimodal Corridor has the potential to transform Mumbai's suburban development, there are several challenges that need to be addressed:

| Location | Key Feature / Junction | |---------------------------|---------------------------------------------------| | | Start point; link to NH-48 & Western Rly | | Bhiwandi | Interchange for NH-160 (Ahmednagar road) | | Kalyan (eastern bypass)| Link to Kalyan–Badlapur road & Central Rly | | Navi Mumbai | Connection to Atal Setu (MTHL) via future spur | | Panvel | Major hub – links to Sion–Panvel Expressway & NH-66 | | Khopoli | Spur connection to Mumbai–Pune Expressway | | Pen | New greenfield segment; Pen–Khopoli link road | | Nagothane | Interchange for Roha–Nagothane industrial belt | | Alibaug (Rewas) | End point; close to proposed JNPT–Rewas connector|

Search for "MMRDA VAMC Phase 3 map" for the most current southern extension details, as Phase 1 (Virar to Shilphata) is already under active construction.